20. JOB AUDIT #1 A minimum of two job audits are required. However, the number of job audits depends on the scope of the audit. Sufficient auditing of the processes and material cast must be conducted so as to satisfactorily answer all questions. If multiple shifts are used, part of the audit shall occur on each shift. If melting and casting occurs only at night, at least 4 continuous hours of auditing shall occur on the night shift Any noncompliance, with respect to existence, adequacy, and/or compliance, observed during the job audits, should be recorded as an NCR on the applicable checklist question/paragraph above, and the NCR should include a reference to the Job audit number for which the noncompliance was observed. 20.1 Date: _______________ 20.2 Job Number: _______________ 20.3 Customer: _______________ 20.4 Part Number: _______________ 20.5 Drawing Number and Rev. Level: _______________ 20.6 Molding Process: _______________ 20.7 Core Making Process: _______________ 20.8 Metal Type: _______________ 20.9 Melt Equipment: _______________ YES NO 20.10 Heat Number: _______________ 20.11 Operations Witnessed: YES/NO 20.12 Sand Preparation YES/NO 20.13 Mold Making YES/NO 20.14 Core Making YES/NO 20.15 Melting YES/NO 20.16 Pouring YES/NO 20.17 Required Melt temperature into the Furnace: _______________ YES NO 20.18 Actual Melt temperature into the Furnace (at the end of melting): _______________ YES NO 20.19 Melt temperature at Start of Pouring: _______________ YES NO 20.20 Maximum Pouring Time Range required: _______________ YES NO 20.21 Actual Pouring Time: _______________ YES NO 20.22 Desprue YES/NO/NA 20.23 If special processes are subcontracted (Welding, Shot Peening, Heat Treating and/or NDT) do the approved sources have active TPG accreditations as required by customer? YES/NO/NA 20.24 Clean/Shot Blasting YES/NO/NA 20.25 Grind/Inspect YES/NO/NA 20.26 Packaging YES/NO/NA 20.27 Shipping YES/NO 21. JOB AUDIT #2 21.1 Date: _______________ 21.2 Job Number: _______________ 21.3 Customer: _______________ 21.4 Part Number: _______________ 21.5 Drawing Number and Rev. Level: _______________ 21.6 Molding Process: _______________ 21.7 Core Making Process: _______________ 21.8 Metal Type: _______________ 21.9 Melt Equipment: _______________ YES NO 21.10 Heat Number: _______________ 21.11 Operations Witnessed: YES/NO 21.12 Sand Preparation YES/NO 21.13 Mold Making YES/NO 21.14 Core Making YES/NO 21.15 Melting YES/NO 21.16 Pouring YES/NO 21.17 Required Melt temperature into the Furnace: _______________ YES NO 21.18 Actual Melt temperature into the Furnace (at the end of melting): _______________ YES NO 21.19 Melt temperature at Start of Pouring: _______________ YES NO 21.20 Maximum Pouring Time Range required: _______________ YES NO 21.21 Actual Pouring Time: _______________ YES NO 21.22 Desprue YES/NO/NA 21.23 If special processes are subcontracted (Welding, Shot Peening, Heat Treating and/or NDT) do the approved sources have active TPG accreditations as required by customer? YES/NO/NA 21.24 Clean/Shot Blasting YES/NO/NA 21.25 Grind/Inspect YES/NO/NA 21.26 Packaging YES/NO/NA 21.27 Shipping YES/NO/NA |
|