| 铸件供应商认可程序审核准则(10)北京TPG_AS7127 | |
| 发表时间:2021-06-25 阅读次数:377 | |
|
22. JOB AUDIT #3 SECTION NA 22.1 Date: _______________ 22.2 Job Number: _______________ 22.3 Customer: _______________ 22.4 Part Number: _______________ 22.5 Drawing Number and Rev. Level: _______________ 22.6 Molding Process: _______________ 22.7 Core Making Process: _______________ 22.8 Metal Type: _______________ 22.9 Melt Equipment: _______________ YES NO 22.10 Heat Number: _______________ 22.11 Operations Witnessed: YES/NO 22.12 Sand Preparation YES/NO 22.13 Mold Making YES/NO 22.14 Core Making YES/NO 22.15 Melting YES/NO 22.16 Pouring YES/NO 22.17 Required Melt temperature into the Furnace: _______________ YES NO 22.18 Actual Melt temperature into the Furnace (at the end of melting): _______________ YES NO 22.19 Melt temperature at Start of Pouring: _______________ YES NO 22.20 Maximum Pouring Time Range required: _______________ YES NO 22.21 Actual Pouring Time: _______________ YES NO 22.22 Desprue YES/NO/NA 22.23 If special processes are subcontracted (Welding, Shot Peening, Heat Treating and/or NDT) do the approved sources have active TPG accreditations as required by customer? YES/NO/NA 22.24 Clean/Shot Blasting YES/NO/NA 22.25 Grind/Inspect YES/NO/NA 22.26 Packaging YES/NO/NA 22.27 Shipping YES/NO 23. JOB AUDIT #4 SECTION NA 23.1 Date: _______________ 23.2 Job Number: _______________ 23.3 Customer: _______________ 23.4 Part Number: _______________ 23.5 Drawing Number and Rev. Level: _______________ 23.6 Molding Process: _______________ 23.7 Core Making Process: _______________ 23.8 Metal Type: _______________ 23.9 Melt Equipment: _______________ YES NO 23.10 Heat Number: _______________ 23.11 Operations Witnessed: YES/NO 23.12 Sand Preparation YES/NO 23.13 Mold Making YES/NO 23.14 Core Making YES/NO 23.15 Melting YES/NO 23.16 Pouring YES/NO 23.17 Required Melt temperature into the Furnace: _______________ YES NO 23.18 Actual Melt temperature into the Furnace (at the end of melting): _______________ YES NO 23.19 Melt temperature at Start of Pouring: _______________ YES NO 23.20 Maximum Pouring Time Range required: _______________ YES NO
23.21 Actual Pouring Time: _______________ YES NO 23.22 Desprue YES/NO/NA 23.23 If special processes are subcontracted (Welding, Shot Peening, Heat Treating and/or NDT) do the approved sources have active TPG accreditations as required by customer? YES/NO/NA 23.24 Clean/Shot Blasting YES/NO/NA 23.25 Grind/Inspect YES/NO/NA 23.26 Packaging YES/NO/NA 23.27 Shipping YES/NO/NA
|
|