• 今天是:2024年5月13日 星期一东莞市纵横世纪企业管理咨询有限公司专注于航空航天汽车军工质量培训
  • 网站首页|加入收藏|联系我们
  • TGP风能电力特殊工序

    您当前所在的位置:首页 > 特殊工序 > TGP风能电力特殊工序

    63K
    电子印制板审核准则(11)宁波TPG_AC7119
    发表时间:2021-07-01     阅读次数:     字体:【

    18 ROUTING N/A

    18.1.P Is there a procedure for the final route/contour process that addresses the following:

    18.1.1.P Cutter compensation? YES/NO

    18.1.2.P Stack height parameters? YES/NO

    18.1.3.P Feed and speed parameters? YES/NO

    18.1.4.P Handling parameters? YES/NO

    18.1.5.P Plunge point offset or double pass to minimize crazing and dust build-up? YES/NO

    18.1.6.P Cutter size and style? YES/NO

    ROUTING COMPLIANCE

    18.1.C Is there a vacuum system present at the point of contact during the cutting process? YES/NO

    18.2.C Is cutter wear monitored and compensated for? YES/NO

    18.3.C Is there a verification of cutter bit size(s) and style for each lot processed? YES/NO

    18.4.C Is there a verification of first piece set up for each new lot processed? YES/NO

    18.5.C Is there a verification of tab size and placement per Customer requirements? YES/NO

    18.6.C Is there a unique identification for each program? YES/NO

    18.7.C Is there objective evidence of configuration and revision control of downloaded programs?

    YES/NO

    18.8.C Is there a backup material used for each spindle position? YES/NO

    18.9.C Is the operator prevented from overriding the recommended cutter feed and speed rates? YES/NO

    18.10.C Are offsets, cutter feeds and speeds controlled? YES/NO

    18.11.C Is there an inspection of the PB for countersink depth/diameter? YES/NO

    18.12.C Is there an inspection of the PB for counterbore depth/diameter? YES/NO

    18.13.C If chamfering is used, is there an inspection of the PB for chamfer requirements? YES/NO/N/A

    18.14.C If the V-groove process is used, is there an inspection of the PB for V-groove depth? YES/NO/N/A

    18.15.C Is there a cleaning step following fabrication? YES/NO

    18.16.C Is preventative maintenance performed on the vacuum system? YES/NO

    19 ELECTRICAL TEST N/A

    19.1.P Is there a procedure covering all means of electrical test, which include the establishment of all voltage, open and short thresholds? YES/NO

    19.2.P Is there a procedure for the analysis of electrical test failures, which includes failure analysis, non-conformance assessment and mandates for documented corrective actions? YES/NO

    19.3.P Is there a requirement that only engineering source file data is used to generate the Electrical Test program? YES/NO

    19.4.P If performed, is there a procedure for High-pot-testing? YES/NO/N/A

    19.5.P If performed, is there a procedure for impedance testing? YES/NO/N/A

    19.6.P Is there a procedure for Electrical Continuity and Isolation Resistance testing? YES/NO

    19.7.P Is there a procedure for Dielectric Withstanding Voltage testing? YES/NO

    19.8.P Is there a procedure for Moisture and Insulation Resistance (MIR) testing? YES/NO

    19.9.P Is there a procedure for Dielectric Withstanding Voltage testing after MIR testing? YES/NO

    19.10.P If performed, is there a procedure for testing buried resistance per Customer

    requirements? YES/NO/N/A

    19.11.P If performed, is there a procedure for testing functional capacitance of a PB? YES/NO /N/A

    ELECTRICAL TEST COMPLIANCE

    One of the following two questions (19.1.C or 19.2.C) shall be answered; both cannot be marked N/A:

    19.1.C If net list testing is Customer supplied, are all end points tested? YES/NO/N/A

    19.2.C If net list testing is generated internally, are all end points tested? YES/NO/N/A

    19.3.C If required by the Customer, are all via midpoints tested? YES/NO/N/A

    19.4.C Is the net list generated from only engineering source file data? YES/NO

    19.5.C Is the extracted net list compared to the original data? YES/NO

    19.6.C Are test yields monitored and reviewed? YES/NO

    19.6.1.C Is there objective evidence that the review of test yields initiates appropriate corrective actions? YES/NO

    19.7.C Is there objective evidence that all established voltage, open and short thresholds are being controlled per the procedure? YES/NO

    19.8.C Is there objective evidence that the tests were 100% passing, with no assumed false negatives? YES/NO

    19.9.C If failed PB’s are reintroduced as good PB’s, have they passed all test requirements(100% coverage)? YES/NO/N/A

    19.10.C If performed, is there objective evidence that the procedure for high-pot testing is being followed? YES/NO/N/A

    19.11.C If performed, is there objective evidence that the procedure for controlled impedance testing is being followed? YES/NO/N/A

    19.12.C Is there objective evidence that the procedure for Electrical Continuity and Isolation Resistance testing is being followed? YES/NO

    19.13.C Is there objective evidence that the procedure for Dielectric Withstanding Voltage testing is being followed? YES/NO

    19.14.C Is there objective evidence that the procedure for Moisture and Insulation Resistance (MIR) testing is being followed? YES/NO

    19.15.C Is there objective evidence that the procedure for Dielectric Withstanding Voltage testing after MIR testing is being followed? YES/NO

    19.16.C If required by Customer, is the procedure for testing buried resistance per Customer requirements? YES/NO/N/A

    19.17.C If required by Customer, is the procedure for testing functional capacitance of a PB per Customer requirements? YES/NO/N/A


     
    上一篇:电子印制板审核准则(10)宁波TPG_AC7119