• 今天是:2024年5月13日 星期一东莞市纵横世纪企业管理咨询有限公司专注于航空航天汽车军工质量培训
  • 网站首页|加入收藏|联系我们
  • TGP风能电力特殊工序

    您当前所在的位置:首页 > 特殊工序 > TGP风能电力特殊工序

    63K
    东莞TPG_AC7119认证_AC7119电子高密度互连印制板审核准则(1)
    发表时间:2021-07-06     阅读次数:     字体:【

    1 SCOPE

    This checklist supplements the TPG-AC7119 core checklist. This checklist shall apply to suppliers seeking accreditation engaged in fabrication of organic High Density Interconnect (HDI) Printed Boards (PBs) and/or HDI layers with microvia technology working in accordance with the Class 3 requirements of IPC-6012 and IPC-6016 Standards or standards as directed by Customer.

    1.1 Purpose

    Approval to the requirements of TPG-AC7119 is a prerequisite for accreditation to this

    supplemental checklist.

    2 GENERAL INSTRUCTIONS

    References

    IPC Publications: Available from IPC, 3000 Lakeside Drive, Suite 309S, Bannockburn, IL 60015-

    1219

    IPC-6012: Qualification and Performance Specification for Rigid Printed Boards

    IPC-6016: Qualification & Performance Specification for High Density Interconnect (HDI)

    Layers or Boards

    3 COMPANY INFORMATION

    3.1 Audit Scope

    The process scopes below identify the contents of the checklist. The auditor is expected to utilize

    the eAuditNet scope verification process to identify the process scopes that are utilized internally.

    The column for internal is to be used only when utilizing the paper checklist (e.g. internal / pre audits). Any process scopes that are outsourced are to be identified in the table below.

    Para Ref Process Internal Outsourced

    4.0 General [ ] [ ]

    5.0 Hole Filling Material Control

    5.1 Conductive Hole Fill Material for Blind and Buried Vias [ ] [ ]

    5.2 Non Conductive Hole Fill Material for Blind and Buried Vias [ ] [ ]

    6.0 Inner Layers Registration [ ] [ ]

    7.0 Material Lamination [ ] [ ]

    8.0 Drilling

    8.1 Mechanical Drilling [ ] [ ]

    8.2 Laser Drilling [ ] [ ]

    9.0 Via Hole Filling Process

    9.2 Oxide Coating / Oxide Replacement Coating [ ] [ ]

    9.3 Buried Via Hole Filling Process [ ] [ ]

    9.4 Blind Via Hole Filling Process [ ] [ ]

    10.0 Final Validation

    10.1 General [ ] [ ]

    10.2 Lifted Lands [ ] [ ]

    10.3 Workmanship (shop floor) [ ] [ ]

    10.4 Dimensional Requirements

    10.4.1 Hole Pattern Accuracy [ ] [ ]

    10.4.2 Registration (Internal) [ ] [ ]

    10.4.3 Annular Ring (External) [ ] [ ]

    10.5 Conductor Definition

    10.5.1 Conductor Width [ ] [ ]

    10.6 Structural Integrity

    10.6.1 Microvia Integrity [ ] [ ]

    10.6.2 Filled Vias [ ] [ ]

    3.0 COMPLIANCE

    There shall be a minimum of (1) job audit completed for this compliance section. As many job audits shall be performed as needed to cover the full scope.

    Additional jobs shall be identified by process segment.

    The audit results (eAuditNet) shall not include any customer proprietary information or technical information on parts designated "Export Controlled - License Required" (EC-LR). If Auditors have any questions about this, they should contact the PRI Staff Engineer for directions.

    3.0.1.C Job 1 Indentity (Info)

    3.0.1.1.C Purchase Order Number: ___________________________________

    3.0.1.2.C Customer (and Prime, if known): _____________________________

    3.0.1.3.C Part Number:_________________________________________

    3.0.1.4.C Part Description:______________________________________

    3.0.1.5.C Date of Job and Job Number:________________________________

    3.0.1.6.C Material Type(s):______________________________________

    3.0.1.7.C Customer Specification:________________________________

    3.0.1.8.C Process Segment: ____________________________________

    3.0.1.9.C Comments: ______________________________________________


     
    上一篇:深圳TPG_AC7119认证_AC7119电子柔性和硬柔性印制板审核准则(2)
    下一篇:贵阳TPG_AC7119认证_AC7119电子高密度互连印制板审核准则(2)