• 今天是:2024年5月12日 星期日东莞市纵横世纪企业管理咨询有限公司专注于航空航天汽车军工质量培训
  • 网站首页|加入收藏|联系我们
  • TGP风能电力特殊工序

    您当前所在的位置:首页 > 特殊工序 > TGP风能电力特殊工序

    63K
    长沙市TPG_AC7120认证_AC7120_电路卡组件的审核标准(5)
    发表时间:2021-07-13     阅读次数:     字体:【

    5 PROCEDURE FOR PROCESS CONTROL

    5.1.P If solder alloys / flux are not specified by customer, is there a procedure for the qualification of solder alloy / flux? YES/NO/N/A

    5.2.P If adhesives are not specified by customer, is there a procedure for the qualification of adhesives? YES/NO/N/A

    PROCEDURE FOR PROCESS CONTROL COMPLIANCE

    5.1.C Are there process flows defined for the industrial production process up to the shipment of the products per each product family which includes:

    a.C - Main manufacturing, inspection and test phases YES/NO

    b.C - Identification of internal and outsourced processes YES/NO

    c.C - Defined quality metrics and where the quality metrics are recorded YES/NO

    5.2.C Is the test coverage in accordance with the customer requirements? YES/NO/N/A

    5.3.C If requested by customer, for new products introduced over past twelve months have risk mitigation actions been adopted and enforced? YES/NO/N/A

    5.4.C When major elements of the proven materials, processes or equipment are changed, are there validation records for the acceptability of changes? YES/NO

    Audit Note: Major elements may include: adhesive and coating, flux, solder paste, cleaning media or system, solder alloy or soldering system?

    5.5.C Are internal non conformances and customer rejections used to develop root cause analysis and corrective actions? YES/NO

    5.6.C Are process key characteristics identified, controlled, monitored and actions taken when out of limits? YES/NO

    5.7.C Is there a method of defining orientation of parts, identification and packaging? YES/NO

    5.8.C Are design issues fed back to the customer? YES/NO

    5.9.C Is there objective evidence for translation of the Part Number definition into shop floor instructions / programs, including the translation of Customer Part Number to shop floor Part Number? YES/NO

    5.10.C Is there objective evidence of a valid AS/EN/JISQ9102 or customer specific First Article Inspection on file? YES/NO

    5.11.C Are documents including customer-supplied documents on site and at the latest revision?

    YES/NO

    6 VISUAL ACUITY

    6.1.P Is there a procedure which addresses the capability needs and controls of visual perception (including test frequency) for assembly and inspection personnel to include color distinction and near sight acuity to a defined national/international standard? YES/NO

    VISUAL ACUITY COMPLIANCE

    6.1.C Is the procedure which addresses the capability needs and controls of visual perception (including test frequency) for assembly and inspection personnel being followed? YES/NO


     
    上一篇:张家港TPG_AC7120认证_AC7120_电路卡组件的审核标准(4)
    下一篇:哈尔滨TPG_AC7120认证_AC7120_电路卡组件的审核标准(6)