• 今天是:2024年5月14日 星期二东莞市纵横世纪企业管理咨询有限公司专注于航空航天汽车军工质量培训
  • 网站首页|加入收藏|联系我们
  • TGP风能电力特殊工序

    您当前所在的位置:首页 > 特殊工序 > TGP风能电力特殊工序

    63K
    长春市TPG_AC7120认证_AC7120_电路卡组件的审核标准(20)
    发表时间:2021-07-20     阅读次数:     字体:【

    procedure? YES/NO

    19.9.C If the saponifier is being used for cleaning, is the saponifier within shelf life? YES/NO/N/A

    19.10.C Is cleanliness verified and recorded according to procedure? YES/NO

    19.11.C Is there objective evidence that the time between soldering and cleaning has been limited to the maximum value specified in procedure? YES/NO

    19.12.C Are the procedures being followed for the setup, operation and maintenance of all cleaning equipment? YES/NO

    19.13.C If required, does the resistivity / conductivity of final rinsing solution meet the level specified in procedure, and is it monitored according to the procedure? YES/NO/N/A

    19.14.C If ultrasonic cleaning is being performed, is it in accordance with J-STD-001? YES/NO/N/A

    19.15.C Has personnel been trained on the use of the equipment? YES/NO

    19.16.C If unclean or mechanically damaged assemblies are found, are they identified and is there evidence of containment and corrective action? YES/NO/N/A

    19.17.C If rework has been performed, is there evidence that the cleaning steps required for the material used have been performed (no-cleaning for no-clean or cleaning performed subsequent to the rework)? YES/NO/N/A

    20 COATING AND ENCAPSULATION N/A

    20.1.P Is there a procedure that identifies coating and or encapsulation product type that meets the customer requirements? YES/NO

    20.2.P If allowed by the customer Is there a procedure that identifies and covers localized removal of coating and or encapsulation including product type? YES/NO/N/A

    20.3.P Are there procedures that define:

    a.P - Minimum cleanliness requirement for the Circuit Card Assembly? YES/NO

    b.P - Method of ensuring cleanliness? YES/NO

    c.P - Shelf life of coating and encapsulation material? YES/NO

    d.P - Method of verification of correct coating and encapsulation material? YES/NO

    e.P - Work time after mixing / pot-life? YES/NO

    f.P - Methods for coating / encapsulation application and removal? YES/NO

    g.P - Application and removal of temporary masking material, if used? YES/NO/N/A

    h.P - ESD safe temporary masking, if used? YES/NO/N/A

    i.P - Setup and configuration (tools, fixtures, jigs, programs)? YES/NO

    j.P - Cleaning of tooling (fixture, nozzle, racks, gauges etc…)? YES/NO

    k.P - Calibration of gauges, if required? YES/NO/N/A

    l.P - Temperature, humidity, ventilation of the room? YES/NO

    m.P - If required by customer, verification of thickness and hardness of the coating? YES/NO/N/A

    n.P - Visual Inspection of coating to include coverage, bubbles, adhesion, cleanliness, marking readability, location, acceptable level of cure? YES/NO

    o.P - Visual Inspection of encapsulation (coverage, fill level, bubbles, adhesion, cleanliness, spillage, cracks etc…), if encapsulation is done? YES/NO/N/A

    p.P - Verification of completed traveler, including reworks? YES/NO

    20.4.P Does a procedure exist to ensure connectors are not contaminated with coating? YES/NO

    20.5.P If assembly coated by dipping, is there a procedure to control the dip line on the board?

    YES/NO/N/A


     
    上一篇:青岛市TPG_AC7120认证_AC7120_电路卡组件的审核标准(19)
    下一篇:四川省TPG_AC7120认证_AC7120_电路卡组件的审核标准(21)