• 今天是:2024年4月29日 星期一东莞市纵横世纪企业管理咨询有限公司专注于航空航天汽车军工质量培训
  • 网站首页|加入收藏|联系我们
  • TGP风能电力特殊工序

    您当前所在的位置:首页 > 特殊工序 > TGP风能电力特殊工序

    63K
    南昌市TPG_AC7120认证_AC7120_电路卡组件的审核标准(27)
    发表时间:2021-07-23     阅读次数:     字体:【

    23 REWORK N/A

    23.1.P Are there procedures which define:

    a.P - Methods and equipment to be used to perform rework? YES/NO

    b.P - Approved tools and materials to be used per component type? YES/NO

    c.P - Product / component specific instructions regarding programmed preheating temperature profiles and use of specialized tooling? YES/NO

    d.P - Component / assembly specific temperature profiles for component removal and replacement, if performed? YES/NO/N/A

    e.P - Subsequent stages to be performed after rework including cleaning, inspection, test or other validation stages / methods? YES/NO

    f.P - Method of preventing parts removed during rework from being reused in the future unless authorized by customer? YES/NO

    g.P - Method of recording component removal / replacement against individual assemblies to identify the type of rework performed, which components have been reworked, number of reworks per location / component identification? YES/NO

    h.P - Maximum number of permitted reworks, if specified by the customer? YES/NO/N/A

    i.P - Specific requirements for the rework of assemblies based upon customer requirements?

    YES/NO

    j.P - Authorization for the performance of rework based upon the type of rework and the stage within the build sequence (including completed / closed order rework) where the non conformity was identified? YES/NO

    k.P - Cleaning method and control of reworked assemblies? YES/NO


     
    上一篇:广州市TPG_AC7120认证_AC7120_电路卡组件的审核标准(26)
    下一篇:合肥市TPG_AC7120认证_AC7120_电路卡组件的审核标准(28)