• 今天是:2024年5月11日 星期六东莞市纵横世纪企业管理咨询有限公司专注于航空航天汽车军工质量培训
  • 网站首页|加入收藏|联系我们
  • TGP风能电力特殊工序

    您当前所在的位置:首页 > 特殊工序 > TGP风能电力特殊工序

    63K
    宁波市TPG_AC7120认证_AC7120_电路卡组件的审核标准(9)
    发表时间:2021-07-15     阅读次数:     字体:【

    12 ELECTRONIC COMPONENT PREPARATION FOR PREASSEMBLY PROCESS N/A

    12.1.P Are there procedures that define:

    a.P - Method of verifying that the kit of components has been prepared and setup correctly? YES/NO

    b.P - Control and use of equipment including unique identification and configuration control? YES/NO

    c.P - Control of soldering, tinning, flux and solder to be used, temperature, process dwell times, and component type specific processing requirements, pot purity maximum contaminants that comply to J-STD-001? YES/NO

    d.P - Preparation operations, including verification of components (bend radius)? YES/NO/N/A

    e.P - Method of application and control of temporary masking where required? YES/NO/N/A

    f.P - Verification of coplanarity SMT components after forming? YES/NO/N/A

    g.P - Re-identification requirements of parts after preparation? YES/NO/N/A

    h.P - Gold removal in accordance with J-STD-001 and customer requirements? YES/NO/N/A

    ELECTRONIC COMPONENT PREPARATION FOR PREASSEMBLY PROCESS COMPLIANCE

    12.1.C If moisture sensitive components are being used, is there evidence of moisture control? YES/NO/N/A

    12.2.C If kitting is performed, is there objective evidence of independent verification of the kit? YES/NO/N/A

    12.3.C If lead forming is performed, are the tools used for lead forming in accordance with the ESD protection procedure? YES/NO/N/A

    12.4.C If defined by procedure, are the parts re-identified after preparation?

    YES/N/N/A

    12.5.C Is the procedure being followed for control and use of equipment? YES/NO

    12.6.C Is the procedure being followed for control of soldering, tinning, flux and solder to be used (ex. analysis of solder purity - gold embrittlement), temperature, process dwell times, component type specific processing requirements? YES/NO

    12.7.C Has the operator been trained for handling, ESD, and prep operations, including inspection of components after processing for compliance to requirements? YES/NO

    12.8.C If required, is the application of temporary masking in accordance with the procedure? YES/NO/N/A

    12.9.C If SMT components are formed, is coplanarity being verified? YES/NO/N/A

    12.10.C After component preparation operations, are the components verified that they are compliant to requirements? YES/NO

    12.11.C If required, is the procedure for gold removal being followed? YES/NO/N/A


     
    上一篇:嘉兴市TPG_AC7120认证_AC7120_电路卡组件的审核标准(8)
    下一篇:昆明TPG_AC7120认证_AC7120_电路卡组件的审核标准(10)