• 今天是:2024年5月12日 星期日东莞市纵横世纪企业管理咨询有限公司专注于航空航天汽车军工质量培训
  • 网站首页|加入收藏|联系我们
  • TGP风能电力特殊工序

    您当前所在的位置:首页 > 特殊工序 > TGP风能电力特殊工序

    63K
    昆明TPG_AC7120认证_AC7120_电路卡组件的审核标准(10)
    发表时间:2021-07-16     阅读次数:     字体:【

    13 STENCIL PRINTING N/A

    13.1.P Are there procedures that define:

    a.P - Validation of solder paste per part number? YES/NO

    b.P - Storage, conditions of use, and control of solder paste integrity? YES/NO

    c.P - Equipment setup including screen orientation, program choice, PB support configuration?

    YES/NO

    13.2.P Is there a procedure for stencil design definition and validation, which includes stencil thickness, aperture size, use and size of step-downs and stencil material type?YES/NO

    13.3.P Are there procedures for maintenance of stencils following use, which include cleaning?

    YES/NO

    13.4.P Are there procedures to control the solder paste printing (solder paste coverage, alignment, shape and inspection rate)? YES/NO

    13.5.P Is there a procedure for cleaning and inspection of misprinted PBs? YES/NO

    STENCIL PRINTING COMPLIANCE

    13.1.C Is paste stored according to the manufacturer specifications? YES/NO

    13.2.C Is the paste shelf life being controlled according to the procedure? YES/NO

    13.3.C Has the supplier ensured that the paste is used as defined in the procedure for the PB currently in process? YES/NO

    13.4.C If required, is the paste warm-up according to the procedure? YES/NO/N/A

    13.5.C If performed, is the paste reconditioning limited according to the procedure? YES/NO/N/A

    13.6.C Is solder paste from any misprinted PB not allowed to be re-used? YES/NO

    13.7.C Is cross contamination between pastes prevented according to the procedure? YES/NO

    13.8.C Are controls of blade integrity done before starting production? YES/NO

    13.9.C Is program versus PB checked during the setup? YES/NO

    13.10.C Are stencil printing parameters adjusted in accordance with the procedure? YES/NO

    13.11.C Is there a control of temperature versus time before reflow, per procedure or

    manufacturer’s recommendation? YES/NO

    13.12.C Are the preventive maintenance activities on solder paste printer completed? YES/NO

    13.13.C Is there objective evidence that personnel are trained for stencil printing process? YES/NO


     
    上一篇:宁波市TPG_AC7120认证_AC7120_电路卡组件的审核标准(9)
    下一篇:南京市TPG_AC7120认证_AC7120_电路卡组件的审核标准(11)