• 今天是:2024年5月12日 星期日东莞市纵横世纪企业管理咨询有限公司专注于航空航天汽车军工质量培训
  • 网站首页|加入收藏|联系我们
  • TGP风能电力特殊工序

    您当前所在的位置:首页 > 特殊工序 > TGP风能电力特殊工序

    63K
    苏州市TPG_AC7120认证_AC7120_电路卡组件的审核标准(14)
    发表时间:2021-07-17     阅读次数:     字体:【

    17 ASSEMBLY SOLDERING PROCESSES N/A

    17.1 Reflow Soldering: N/A

    17.1.1.P Are there procedures that define:

    a.P - Moisture control and/or baking for PB/CCA? YES NO

    b.P - Moisture control for sensitive components based on J-STD-033 and/or JSTD-020, unless otherwise specified by customer? YES/NO

    c.P - Method of initial program validation, validation of revisions including authorization rules?

    YES/NO

    d.P - Setup of equipment, programs and tools including temperatures, speeds, atmosphere, etc.?

    YES/NO

    e.P - Profile traceability? YES/NO

    f.P - Inspection plan? YES/NO

    g.P - Monitoring of controlled atmosphere, if used? YES/NO/N/A

    h.P - Cleaning method and maximum time permitted between reflow and clean for each paste chemistry used? YES/NO

    Audit Note: Maximum allowed time of 8 hours unless otherwise specified by customer or manufacturer’s recommendation.

    Reflow Soldering COMPLIANCE

    17.1.1.C Are the PB / CCA being controlled to minimize moisture ingress in accordance with the procedure? YES/NO

    17.1.2.C If used, are moisture sensitive components handled in accordance with the procedure?

    YES/NO/N/A

    17.1.3.C Is the maximum time permitted between solder paste application and reflow not being exceeded?YES/NO

    17.1.4.C Is the qualified paste being used for the part number being soldered? YES/NO

    17.1.5.C Is set-up of equipment being carried out according to the procedure? YES/NO

    17.1.6.C Is the profile in use being monitored according to the procedure to assure compliance to the defined requirements for temperature and time parameters? YES/NO

    17.1.7.C If controlled atmosphere is used, is the procedure for monitoring being followed?

    YES/NO/N/A

    17.1.8.C Are all drawings, machine programs, written instructions, product specific fixtures under configuration control, and do they match the Assembly traveler? YES/NO

    17.1.9.C Is there evidence that the preventive maintenance is complete, including thermocouple calibration, periodic cleaning of equipment and tools? YES/NO

    17.1.10.C Is there evidence of program validation and approval per procedure? YES/NO

    17.1.11.C Is there evidence that the method of program revision is being followed? YES/NO

    17.1.12.C Are the work instructions including the sequence of operation being followed? YES/NO

    17.1.13.C Is there evidence that the inspection plan is being followed? YES/NO

    17.1.14.C Are soldering defects including solder joint touchup identified, recorded and addressed in a continuous improvement plan? YES/NO


     
    上一篇:无锡市TPG_AC7120认证_AC7120_电路卡组件的审核标准(13)
    下一篇:拉萨市TPG_AC7120认证_AC7120_电路卡组件的审核标准(15)